After all of that compressing, Bob came back over the slab and dug a trench for the well water line to come in towards the house. Here is Corey looking over the trench before laying the pipe.
Before you lay the pipe, it has to be cushioned by some sand. The dogs thought this was the best thing in the world, and by the way, bring all of that fun into my house. Not so fun for me.
Here is the trench with the pipe.
After the inspection, Corey Covered and compacted the trench. Now he has to make baby trenches to lay all of the septic lines for the bathrooms. This is a lot of back labor, but on the positive side, it is now late September and our temperatures are in the low 80's. Most of you would think that that was still really hot, however, it is like a vacation. It is so beautiful, we wish these temperatures would last, but soon the temperatures will plummet, and it will be really cold. You won't be seeing him shirtless for much longer.
Corey taking a water break - Hey get back to work!!! This isn't union.
No comments:
Post a Comment